MEP Value Engineering in Kansas City, MO
Cut Over $1 Million in Construction Costs Without Sacrificing Performance or Quality
Every construction project faces the same tension: you need high-performing MEP systems, but budgets are finite and getting tighter.
Too often, building owners and construction managers are presented with overengineered mechanical, electrical, and plumbing designs that inflate bids, complicate construction timelines, and drive up long-term operating costs, all without delivering better performance meaningfully. The result is wasted capital, frustrated contractors, and buildings that cost more to operate than they should.
5BY5 Engineering approaches MEP design from a fundamentally different angle. Founded by engineers with deep construction management experience, our team doesn't just design systems that work on paper, we design systems that make financial sense in the real world. Our value engineering process systematically evaluates every component, every routing decision, and every equipment selection to find opportunities where smarter design delivers identical or superior performance at significantly lower cost. This isn't about cutting corners. It's about cutting waste.
For Kansas City's construction managers, developers, and building owners, this means a local engineering partner who understands both the regional construction market and the practical realities of building in the Midwest. From healthcare expansions to commercial developments across the metro, 5BY5 has saved clients over $1 million in unnecessary construction costs while simplifying operations and reducing annual maintenance expenses by more than $300,000. When your next project needs to perform on budget and on schedule, you need an engineer who thinks like a builder.
✔ Saved clients over $1 million in unnecessary construction costs
✔ Helped clients simplify operations, saving over $300,000 yearly in maintenance fees
✔ Helped over 100 owners make buildings more efficient with well-designed MEP systems
✔ Proven experience with Kansas City brewery projects, including City Barrel Brewery and Limitless Brewing
✔ Founded in 2016 by Brock Centlivre, PE, Principal in Charge
Our Services
MEP value engineering is the disciplined process of analyzing mechanical, electrical, and plumbing system designs to identify opportunities where equivalent or better performance can be achieved at lower cost.
At 5BY5 Engineering, this isn't an afterthought bolted onto a finished design, it is woven into our engineering methodology from the first day of a project. Every system we design is evaluated not only for code compliance and performance but for constructability, material efficiency, and long-term operational economy.
Our process begins with a thorough assessment of project goals, building use requirements, and budget constraints. We work collaboratively with architects, contractors, and owners to understand the full picture before committing to any design direction. From there, our engineers evaluate alternatives across every major system: HVAC equipment sizing, electrical distribution architecture, plumbing fixture selections, ductwork and piping routing, and controls strategies. Each alternative is measured against the same performance benchmarks as the original design, ensuring that no functionality is lost in the pursuit of savings.
What sets 5BY5 apart in the Kansas City market is our dual fluency in engineering design and construction execution. Many pure design firms specify systems without fully understanding their real-world installation costs, the labor hours, the coordination challenges, the material waste that inflates bids. Because our team has walked jobsites and managed construction, we identify savings opportunities that others simply cannot see. We know which equipment simplifications translate to fewer trade coordination conflicts, which routing changes eliminate expensive structural penetrations, and which standardized components reduce lead times and procurement costs.
The outcome is a set of MEP documents that contractors can build efficiently, owners can operate affordably, and occupants can rely on daily. Our clients across healthcare, retail, hospitality, and government sectors have experienced this firsthand, receiving fully code-compliant, high-performing buildings that came in significantly under their original cost projections.
Slash Construction Costs With Smarter Engineering
how you benefit
-
One of the most common sources of unnecessary construction cost is oversized MEP equipment. It happens more than most owners realize: mechanical engineers apply excessive safety factors, specify equipment based on worst-case scenarios that will never occur simultaneously, or default to larger units because "bigger is safer." The result is HVAC chillers, boilers, air handlers, and electrical gear that cost significantly more to purchase, install, and operate, without delivering any real performance advantage.
5BY5 Engineering's value engineering approach applies rigorous load analysis to every major piece of equipment. We use detailed energy modeling and occupancy data to right-size systems precisely to the building's actual demand profile, including part-load conditions where equipment spends the vast majority of its operating life. In the Kansas City climate, where seasonal swings between extreme heat and cold create widely variable loads, this precision matters enormously. A right-sized variable-speed chiller plant, for example, can cost $150,000 to $300,000 less than an oversized constant-volume alternative while delivering better energy performance across all seasons.
The savings extend well beyond first cost. Oversized equipment cycles on and off more frequently, increasing wear, reducing lifespan, and driving up maintenance expenses. Right-sized systems operate in their optimal efficiency range, reducing utility costs year after year. For Kansas City building owners managing portfolios of healthcare facilities, commercial properties, or government buildings, this compounding benefit translates into substantial long-term savings. Our clients have seen equipment rightsizing alone account for six-figure reductions in project cost, money redirected to building features that actually improve occupant experience.
-
The routing and layout of ductwork, piping, and electrical conduit often represents 40% or more of total MEP installation cost, yet it's an area where many design firms invest surprisingly little optimization effort. Complex routing with excessive fittings, unnecessary elevation changes, and convoluted pathways doesn't just inflate material quantities; it dramatically increases trade labor hours and creates coordination conflicts that cause costly delays during construction.
5BY5 Engineering treats distribution system design as a critical value engineering opportunity. Our engineers analyze every major run of ductwork and piping to find shorter, straighter paths that maintain proper system performance. We evaluate alternative distribution architectures — such as variable air volume systems that reduce duct sizes, or distributed pumping strategies that eliminate oversized central headers, and calculate the installed cost impact of each option. Because our team understands how contractors actually install these systems in the field, we design routes that minimize complex fittings, reduce the number of structural penetrations, and allow trades to work in parallel rather than in sequence.
In Kansas City's competitive construction labor market, where skilled tradespeople are in high demand, reducing installation complexity directly translates to lower bids and faster schedules. A simplified mechanical distribution system can save 15% to 25% on installation labor compared to a conventionally designed alternative. For a mid-sized commercial or healthcare project, that efficiency gain can represent $100,000 or more in hard construction savings. Our clients benefit from cleaner ceiling spaces, easier future maintenance access, and buildings that were simply less expensive to construct, all because the distribution systems were designed with constructability as a primary objective.
-
Custom and specialty MEP components are a hidden cost driver on many construction projects. When engineers specify unique equipment models, non-standard fitting sizes, or one-off control configurations, the downstream effects ripple through procurement schedules, contractor pricing, and long-term parts availability. Every non-standard item requires special ordering, often carries premium pricing, extends lead times, and creates maintenance headaches for facility staff who must source replacement parts from limited suppliers.
5BY5 Engineering's value engineering methodology prioritizes standardization wherever it does not compromise system performance. We actively evaluate whether a specified piece of equipment can be replaced with a widely available, industry-standard alternative that meets the same performance criteria. We standardize valve types, fitting configurations, electrical panel layouts, and control sequences across systems within a building, and across buildings within an owner's portfolio. This standardization philosophy reduces the total number of unique parts a facility team must stock, simplifies training for operations staff, and creates competitive procurement conditions where multiple suppliers can bid on standard items.
For Kansas City's healthcare systems and institutional building owners managing multiple facilities, the impact of standardization is particularly significant. When every building in a portfolio uses the same family of VAV boxes, the same line of circuit breakers, and the same control platform, maintenance efficiency improves dramatically and spare parts inventory costs drop. On the construction side, standardized specifications attract more competitive bids because contractors can leverage existing supplier relationships and volume pricing. Our clients have seen procurement cost reductions of 10% to 20% on major equipment packages simply by shifting from custom specifications to smart, performance-equivalent standard alternatives. The result is a building that performs identically but costs significantly less to build and operate.
-
Initial construction cost tells only part of the story. A piece of HVAC equipment that saves $20,000 on installation but consumes $8,000 more in energy annually is not a savings, it's a liability. Yet without rigorous lifecycle cost analysis, many construction decisions are made based solely on first cost, leading building owners to unknowingly commit to decades of excessive operating expense.
5BY5 Engineering integrates lifecycle cost analysis into every value engineering recommendation. For each alternative we propose, we calculate not only the construction cost impact but also the projected energy consumption, maintenance requirements, expected equipment lifespan, and replacement costs over a 20- to 30-year analysis period. This allows our clients to make decisions with full financial visibility, choosing options that optimize total cost of ownership rather than simply minimizing the construction contract.
In the Kansas City market, where energy costs and climate demands create significant operational expenses, lifecycle analysis frequently reveals that moderately higher first-cost investments in efficient equipment pay for themselves within three to five years. Conversely, it also identifies cases where premium equipment offers marginal performance gains that do not justify the added expense. This balanced, data-driven approach ensures that every dollar spent on MEP systems delivers maximum return. Our clients, from commercial developers to healthcare administrators, use these analyses to make confident capital decisions, secure stakeholder buy-in, and demonstrate fiscal responsibility. When you know the true 20-year cost of every design choice, you stop guessing and start optimizing.
-
A beautifully engineered MEP design that is difficult to build is an expensive MEP design. Contractors price risk, complexity, and coordination difficulty into every bid they submit. When mechanical and electrical systems require intricate sequencing, tight tolerances in congested ceiling spaces, or extensive field modifications to resolve conflicts, those costs show up as higher bids, more change orders, and longer construction timelines.
5BY5 Engineering's construction management background is our most powerful value engineering asset. Our engineers evaluate every design decision through the lens of field installation, asking: How will a contractor actually build this? Where will trades conflict? What sequences create bottlenecks? We design MEP systems with generous access clearances, logical installation sequences, and pre-coordinated routing that minimizes field conflicts. We also leverage BIM coordination to identify and resolve clashes before they become expensive change orders during construction.
For Kansas City construction managers operating under tight schedules and competitive budgets, constructability-focused engineering delivers immediate, measurable value. Projects designed with installation efficiency in mind typically receive lower bids because contractors see less risk and fewer unknowns. Construction timelines compress because trades encounter fewer conflicts and can maintain productive workflows. Change order rates drop because the design has already accounted for real-world installation conditions.
One Kansas City-area project where 5BY5 applied constructability-focused value engineering saw a 12% reduction in MEP subcontractor bids compared to the original design, representing hundreds of thousands of dollars in savings that went directly to the owner's bottom line. This is the tangible advantage of hiring engineers who understand construction as deeply as they understand engineering.
-
Building codes establish minimum performance thresholds, but they rarely prescribe a single path to compliance. There are almost always multiple code-compliant approaches to achieving the required ventilation rates, electrical capacity, plumbing fixture counts, and fire protection coverage for any given building. The difference in cost between these compliant alternatives can be substantial.
5BY5 Engineering's value engineering process systematically identifies code-compliant alternatives that achieve required performance levels through more cost-effective means. This might involve substituting a demand-controlled ventilation strategy for a constant-volume outdoor air system, using an alternative electrical distribution topology that reduces copper requirements, or selecting a different fire protection approach that eliminates the need for a dedicated fire pump. In every case, the alternative fully meets applicable codes, including the International Building Code, International Mechanical Code, National Electrical Code, and NFPA standards, while reducing construction cost.
This approach is particularly valuable for Kansas City healthcare and institutional projects, where code requirements are stringent and the consequences of non-compliance are severe. Our engineers maintain current knowledge of all applicable codes and work closely with local authorities having jurisdiction to ensure that every alternative we propose will pass inspection without issue. We document our code compliance rationale thoroughly, giving owners and contractors complete confidence that cost savings have not come at the expense of regulatory compliance. The result is a building that meets every code requirement, performs to full design intent, and costs significantly less to construct. This is the definition of smart engineering: achieving the same outcome through better design, not through compromise.
OUR SERVICE Categories
MEP Engineering
5BY5 Engineering delivers comprehensive mechanical, electrical, and plumbing design services across commercial, healthcare, and institutional sectors in Kansas City. Our MEP engineering integrates value engineering principles from project inception, ensuring every system is designed for optimal performance, energy efficiency, and cost-effectiveness. We serve as a full-service MEP design partner from schematic design through construction administration.
Infrastructure Improvements
Aging buildings and evolving operational demands require infrastructure upgrades that align with current codes, modern efficiency standards, and future growth plans. 5BY5 designs infrastructure improvement projects that address existing deficiencies while incorporating value-engineered solutions that minimize construction disruption and maximize the return on capital investment for Kansas City building owners.
Building System Optimization
For existing buildings, 5BY5 evaluates installed MEP systems to identify opportunities for operational improvements, energy savings, and maintenance cost reduction. Our optimization assessments frequently uncover oversized equipment, inefficient control sequences, and unnecessary system complexity that can be corrected to reduce annual operating costs, extending value engineering principles beyond new construction into ongoing facility management.
Commissioning
Commissioning ensures that newly installed or renovated MEP systems actually perform as designed, verifying equipment operation, control sequences, and system integration before the building is occupied. 5BY5's commissioning services close the loop on value engineering by confirming that cost-saving design alternatives deliver their projected performance, giving owners documented assurance that their investment is performing as promised.
Energy Efficiency Consulting
5BY5 provides energy analysis and consulting services that quantify the financial impact of design alternatives, support utility incentive applications, and guide long-term energy reduction strategies. Our energy consulting integrates directly with our value engineering process, ensuring that efficiency improvements are evaluated alongside construction cost impacts for a complete financial picture.
OUR process
STEP ONE
Learn Your Project Goals and Budget Reality
(Week 1)
Every value engineering engagement begins with 5BY5's core discipline: learning. We meet with the building owner, construction manager, architect, and key stakeholders to fully understand the project's intent, performance requirements, budget constraints, and schedule pressures. We review existing design documents, construction estimates, and any specific concerns about cost overruns. This discovery phase ensures that our value engineering efforts are targeted at the areas of greatest impact and aligned with the priorities that matter most to the project team. The client's involvement at this stage is essential; we need honest information about budget targets, operational expectations, and non-negotiable performance requirements to direct our analysis effectively.
STEP TWO
Analyze Every System for Cost-Saving Opportunities
(Weeks 2-3)
Our engineers conduct a systematic, component-by-component review of the MEP design. We evaluate equipment selections, distribution routing, control strategies, material specifications, and code compliance pathways. For each system, we identify alternatives that could achieve the same or better performance at lower cost. We use energy modeling, lifecycle cost analysis, and construction cost databases to quantify the financial impact of every proposed change. This is the most intensive phase of the process, and it is where 5BY5's unique combination of engineering expertise and construction knowledge produces the greatest advantage.
STEP THREE
Collaborate With the Full Project Team on Alternatives
(Week 4)
We present our findings and proposed alternatives in a structured value engineering workshop with all stakeholders. Each recommendation includes a clear description of the proposed change, the projected cost savings (both first cost and lifecycle), any performance implications, and the code compliance basis. This collaborative session allows the architect, contractor, and owner to evaluate each option, ask questions, and make informed decisions together. We encourage open dialogue; some alternatives may be accepted immediately, others may require modification, and some may be set aside. The goal is consensus on a final set of value-engineered design changes.
STEP FOUR
Implement Approved Changes Into Final Design Documents
(Weeks 5-6)
Once the project team approves a set of value engineering recommendations, our engineers incorporate the changes into the MEP construction documents. We update drawings, specifications, equipment schedules, and control narratives to reflect the approved alternatives. Every change is documented with a value engineering log that tracks the original design, the approved alternative, the projected savings, and the code compliance rationale. The result is a complete, coordinated, bid-ready set of MEP documents that reflect every approved cost reduction.
STEP FIVE
Verify Savings Through Construction and Commissioning
(Ongoing Through Project Completion)
Value engineering doesn't end when the documents are issued. 5BY5 provides construction administration support to ensure that value-engineered alternatives are installed correctly, and that projected savings are realized in the field. During commissioning, we verify that systems perform as designed, confirming that cost reductions have not compromised functionality. This closed-loop approach gives owners documented confidence that every dollar saved during value engineering has translated into real-world results.
Our APPROACH
At 5BY5 Engineering, our approach to MEP value engineering is grounded in a philosophy that may sound simple but is surprisingly rare in the design profession: every engineering decision is also a financial decision, and it should be treated as one.
We believe that designing high-performing buildings and controlling construction costs are not competing objectives; they are complementary outcomes of disciplined, thoughtful engineering. Our mission to simplify building system operations drives every value engineering recommendation we make, because simpler systems are inherently less expensive to build, easier to maintain, and more reliable over their operational life.
Our methodology is built on the integration of engineering performance analysis and real-world construction cost intelligence. While many engineering firms optimize for technical elegance, we optimize for total project value. This means we evaluate every equipment selection not only for its energy performance rating but for its installed cost, its maintenance requirements, its parts availability, and its impact on the trades installing it. We assess distribution systems not only for pressure drop and capacity but for routing efficiency, fitting counts, and coordination complexity. We examine control strategies not only for precision but for operational simplicity, because a sophisticated control system that facility staff cannot understand or maintain is not a good investment.
This dual perspective exists because 5BY5 was built to bridge the gap between engineering and construction. Our team understands what happens after documents leave the engineering office, the bidding process, the procurement challenges, the field conditions that turn a clean drawing into a costly change order. In the Kansas City construction market, where project teams expect practical, buildable designs, this understanding is a significant competitive advantage for our clients.
The result of this approach is consistently demonstrated in our project outcomes: over $1 million in documented construction cost savings, more than $300,000 in annual maintenance fee reductions, and over 100 building owners who operate more efficient facilities. We don't achieve these results by reducing quality. We achieve them by refusing to accept that expensive is the same as excellent. Smart engineering, the kind that questions assumptions, evaluates alternatives, and respects every dollar in the budget, is what we deliver on every project.
FREQUENTLY ASKED QUESTIONS
5BY5 Engineering has served Kansas City and surrounding areas since 2016, delivering MEP engineering solutions that prioritize simplicity, reliability, and cost-effectiveness. Led by Principal in Charge Brock Centlivre, our team specializes in mechanical, electrical, and plumbing design for healthcare, retail, hospitality, and government sectors, with a proven track record of saving clients over $1 million in construction costs. Learn more about our team and approach.
-
Value engineering is a systematic process of evaluating design alternatives that achieve the same performance and code compliance at lower cost. It is fundamentally different from cost-cutting, which typically reduces scope or quality. When 5BY5 proposes a value engineering alternative, we document that it meets the same performance criteria, complies with all applicable codes, and delivers equivalent or better reliability. Nothing is sacrificed, the path to the outcome simply becomes more efficient.
-
The earlier, the better. The greatest cost-saving opportunities exist during schematic design and design development, when system architecture decisions are still flexible. However, value engineering can deliver meaningful savings even during the construction document phase or after initial bids come in higher than budget. 5BY5 recommends engaging our team as early as possible, but we have successfully reduced costs on projects at every stage of development.
-
When integrated into the normal design timeline, value engineering typically adds no schedule delay and can actually compress construction timelines by improving constructability. When performed as a separate review after design completion, the value engineering process typically requires four to six weeks. The schedule investment is consistently justified by the magnitude of cost savings achieved, often representing five to ten times the value of the time invested.
-
Savings vary based on project size, complexity, and how aggressively the original design was optimized. On a typical mid-sized commercial or healthcare project in the Kansas City area, 5BY5's value engineering process identifies savings ranging from 10% to 25% of total MEP construction cost. Across our portfolio, we have saved clients over $1 million in documented unnecessary construction costs.
-
Production facilities with high cooling, heating, and ventilation loads offer significant energy savings opportunities. 5BY5 evaluates heat recovery from refrigeration systems, variable-speed drives on pumps and fans, energy recovery ventilation for high-exhaust applications, and right-sized equipment that avoids the inefficiency of oversized systems operating at partial load. While savings vary by facility, our portfolio-wide track record includes over $300,000 in annual maintenance and operating cost savings delivered to clients.
Cut Your KC Construction Costs
Stop overpaying for MEP systems. Get a value engineering analysis from the team that has saved clients over $1M.