Healthcare MEP Engineering in Kansas City
Simplified Hospital Systems That Cut Construction Costs and Reduce Maintenance Headaches
Healthcare facilities operate under some of the most demanding building requirements in any industry.
From maintaining precise humidity levels in operating suites to ensuring uninterrupted power to life-safety systems, the margin for error is zero. Yet too many hospitals and medical centers are burdened with overly complex MEP systems that drain budgets, confuse maintenance teams, and create compliance risks. If your facility staff spends more time troubleshooting building systems than focusing on patient care support, the problem is not your people, it is your engineering.
5BY5 Engineering takes a fundamentally different approach to healthcare MEP design. Rather than layering complexity on top of complexity, we engineer mechanical, electrical, and plumbing systems that are deliberately simplified without sacrificing performance, code compliance, or redundancy. Our work with major Kansas City health systems, including Children's Mercy, Saint Luke's, and LMH Health, has saved clients over $1 million in unnecessary construction costs and more than $300,000 per year in ongoing maintenance fees. We accomplish this by designing systems that your existing facility staff can actually understand, operate, and maintain.
For healthcare administrators and facility directors across the Kansas City metro, this means partnering with a local engineering firm that already understands the region's healthcare infrastructure, regulatory landscape, and the operational realities of running a medical facility. Our office at 1100 Main Street in downtown Kansas City positions us to respond quickly, collaborate closely with your teams, and stay engaged from design through commissioning and beyond.
✔ Saved clients over $1 million in unnecessary construction costs
✔ Helped clients simplify operations, saving over $300,000 yearly in maintenance fees
✔ Helped over 100 owners make buildings more efficient with well-designed MEP systems
✔ Proven experience with Kansas City brewery projects, including City Barrel Brewery and Limitless Brewing
✔ Founded in 2016 by Brock Centlivre, PE, Principal in Charge
Our Services
Healthcare MEP engineering is the specialized design of mechanical, electrical, and plumbing systems for hospitals, clinics, surgical centers, and medical office buildings.
Unlike commercial or retail projects, healthcare facilities must comply with a rigorous framework of codes and standards, including NFPA 99 (Health Care Facilities Code), ASHRAE Standard 170 (Ventilation of Health Care Facilities), and FGI Guidelines for Design and Construction of Hospitals. 5BY5 Engineering brings deep fluency in these requirements, translating complex regulatory mandates into practical, buildable system designs that protect patients, support clinical operations, and respect your capital budget.
Our healthcare MEP process begins with learning, understanding your facility's clinical mission, operational workflows, existing infrastructure, and the expectations of every stakeholder from the C-suite to the maintenance shop. We then collaborate with architects, construction managers, infection control professionals, and facility operations teams to develop system concepts that balance performance with simplicity. This collaborative phase is where the most significant cost savings are identified, because we challenge assumptions, eliminate redundant components, and right-size equipment before a single line is drawn.
Design execution follows a performance-driven methodology. HVAC systems are engineered for precise temperature and humidity control in critical environments, operating rooms, isolation rooms, sterile processing departments, and pharmacies, while maintaining energy efficiency throughout the building. Electrical designs address normal power, emergency power, and essential electrical system branches required by NFPA 99, with particular attention to generator sizing, automatic transfer switching, and critical system redundancy. Plumbing designs encompass medical gas systems, domestic water with infection control considerations, and specialized waste systems required in laboratory and surgical environments.
The result is a set of construction documents and specifications that contractors can build efficiently, facility teams can operate confidently, and administrators can trust to perform reliably for decades. Every 5BY5 healthcare project is designed with the end user in mind, the technician at 2 a.m. who needs to understand the system without calling an engineer.
Simplify Your Healthcare Facility Systems Today
how you benefit
-
Healthcare construction budgets are under relentless pressure. Rising material costs, labor shortages, and the sheer complexity of medical facility requirements mean that every dollar spent on MEP systems must deliver measurable value. Too often, healthcare organizations accept inflated construction costs as inevitable, the result of over-engineered systems, excessive redundancy that goes beyond code requirements, or designs that fail to account for practical constructability.
5BY5 Engineering has a documented track record of saving healthcare clients over $1 million in unnecessary construction costs across our project portfolio. We achieve this not by cutting corners, but by questioning every design assumption against actual code requirements and operational needs. During our work with Saint Luke's Health System on facility expansions across the Kansas City metro, our engineers identified multiple opportunities to consolidate mechanical systems, right-size electrical infrastructure, and eliminate redundant equipment that had been specified out of convention rather than necessity.
This value engineering is embedded in our design process from day one, not treated as an afterthought during bid review. By the time construction documents reach the contractor's desk, the waste has already been removed. For Kansas City healthcare administrators managing multi-million-dollar capital programs, this approach protects budgets while ensuring full compliance with NFPA 99, ASHRAE 170, FGI Guidelines, and all applicable state and local codes. The savings are real, documented, and repeatable across projects of every scale.
-
The true cost of a poorly designed MEP system does not show up in the construction budget, it shows up every month in maintenance invoices, emergency service calls, and staff overtime. Complex systems with proprietary controls, inconsistent equipment platforms, and convoluted sequences of operation create an ongoing operational burden that drains resources year after year. For healthcare facility directors in Kansas City, this is not an abstract problem, it is a line item that erodes operating margins and diverts funds from patient care.
5BY5 Engineering designs healthcare MEP systems with one guiding principle: the people who operate this building every day should be able to understand, troubleshoot, and maintain every system without specialized outside support. This philosophy has helped our clients save more than $300,000 annually in maintenance fees. We accomplish this by standardizing equipment across facilities, specifying open-protocol controls that facility staff already know, and writing sequences of operation in plain language that a building engineer, not just the original designer, can follow.
Our work with Children's Mercy on critical backup systems exemplifies this approach. Rather than designing a bespoke system that required specialized vendor support, we engineered a backup infrastructure using standardized components and straightforward control logic. The result was a system that the existing facility team could operate and maintain independently, eliminating ongoing service contracts and reducing response time during critical events. For every Kansas City healthcare facility we serve, the goal is the same: systems that are as easy to operate as they are reliable.
-
Healthcare facility engineering is governed by a layered, evolving regulatory framework that generic MEP firms often struggle to navigate. NFPA 99 dictates the design and testing requirements for essential electrical systems, medical gas and vacuum systems, and fire protection. ASHRAE Standard 170 establishes minimum ventilation rates, pressure relationships, and filtration requirements for dozens of distinct healthcare space types. FGI Guidelines define the physical environment standards that inform architectural and engineering decisions for hospitals, outpatient facilities, and residential health care. State and local jurisdictions in Missouri and Kansas add further layers of review and approval.
5BY5 Engineering does not treat code compliance as a checklist to be reconciled at the end of a project. Our healthcare MEP engineers integrate regulatory requirements into the earliest conceptual design phases, ensuring that every system decision, from air change rates in isolation rooms to emergency power distribution architecture, is code-compliant by design rather than by correction. This proactive approach eliminates costly redesign cycles, reduces plan review timelines with authorities having jurisdiction, and gives facility owners confidence that their building will pass inspection and accreditation without surprises.
For Kansas City-area health systems navigating Joint Commission accreditation, CMS Conditions of Participation, and state licensing surveys, this level of regulatory expertise is not optional, it is essential. Our experience with Children's Mercy, Saint Luke's, and LMH Health has given us direct familiarity with the expectations of local plan reviewers and inspectors, allowing us to anticipate and resolve compliance questions before they become project delays.
-
Infection control is a defining concern in healthcare facility design, and the MEP systems are the front line of defense. Airborne pathogen control depends on precisely engineered ventilation rates, pressure relationships between spaces, and filtration systems that meet or exceed ASHRAE 170 requirements. Humidity control, particularly in operating rooms and sterile processing departments, must be maintained within narrow tolerances to prevent microbial growth and ensure the efficacy of sterilization processes. A single design error in these systems can compromise patient safety and expose the facility to regulatory action.
5BY5 Engineering designs healthcare HVAC systems with infection control as a primary design parameter, not an afterthought. We work closely with infection control practitioners and clinical staff during the design phase to understand the specific pathogen risks, workflow patterns, and environmental requirements of each clinical space. Our designs incorporate HEPA filtration where required, precisely calibrated pressure cascades between clean and contaminated zones, and humidity control systems that maintain operating room conditions within the 20-60% relative humidity range mandated by current guidelines.
In the Kansas City metro, where seasonal humidity swings create significant challenges for healthcare HVAC systems, our local experience is a critical advantage. We design systems that perform reliably through Missouri summers and Kansas winters, maintaining compliant conditions year-round without excessive energy consumption. Our engineers understand the specific climate data, utility infrastructure, and equipment performance characteristics relevant to this region, knowledge that generic national firms simply cannot replicate.
-
When a hospital's critical systems fail, the consequences are measured in patient safety, not just dollars. Emergency generators must start and transfer load within ten seconds per NFPA 110. Medical gas systems must maintain uninterrupted supply to every outlet in the facility. Chilled water and heating systems must continue operating to maintain environmental conditions in critical care areas. The engineering behind these redundant systems must be flawless, and the operational procedures for activating and maintaining them must be straightforward enough for any qualified facility technician to execute under pressure.
5BY5 Engineering has deep experience designing critical system redundancy for Kansas City healthcare facilities. Our work with Children's Mercy on backup mechanical and electrical systems demonstrated our ability to engineer robust redundancy that facility teams can operate with confidence. We design N+1 and 2N redundancy configurations based on a rigorous assessment of each facility's risk tolerance, clinical requirements, and budget parameters, ensuring that redundancy investments are targeted where they matter most rather than applied indiscriminately.
Our approach extends beyond equipment sizing to encompass system architecture, transfer logic, alarm management, and maintenance procedures. Every redundant system we design includes clear documentation, graphic sequences of operation, single-line diagrams, and maintenance protocols, that enable facility teams to test, operate, and maintain backup systems without relying on outside consultants. For Kansas City hospitals and medical centers operating around the clock, this level of clarity and reliability is not a luxury, it is a requirement for safe, continuous patient care.
-
Even the best-engineered MEP systems can underperform if they are not properly installed, calibrated, and tested before occupancy. Healthcare facilities are particularly vulnerable to commissioning gaps because the consequences of a malfunctioning system, inadequate ventilation in an isolation room, a medical gas crossover, an emergency power transfer failure, can directly endanger patients. Commissioning is the quality assurance process that bridges the gap between design intent and operational reality, and 5BY5 Engineering delivers it as an integrated service, not a disconnected third-party review.
Our commissioning process begins during design, establishing clear performance criteria and testing protocols for every MEP system in the facility. During construction, we conduct regular site observations and pre-functional inspections to identify and resolve installation issues before they become costly corrections. Functional performance testing verifies that every system, from individual air handling units to the integrated building automation system, operates according to design specifications under normal, emergency, and failure conditions.
For Kansas City healthcare organizations, our commissioning services provide documented evidence of system performance that supports Joint Commission surveys, CMS compliance reviews, and state licensing inspections. Every test result, deficiency resolution, and system verification is recorded in a comprehensive commissioning report that becomes a permanent part of the facility's operational documentation. With over 100 building owners served, and a portfolio that includes the Kansas City region's most respected health systems, 5BY5 Engineering delivers commissioning with the rigor and accountability that healthcare facilities demand.
OUR SERVICE Categories
Healthcare HVAC Design
5BY5 Engineering designs heating, ventilation, and air conditioning systems purpose-built for healthcare environments. Our HVAC solutions address the stringent requirements of ASHRAE Standard 170, including precise air change rates, pressure relationships, temperature control, and humidity management for operating rooms, isolation rooms, pharmacies, and sterile processing departments. Every system is optimized for energy efficiency and ease of maintenance by Kansas City-area facility teams.
Healthcare Electrical Systems & Emergency Power
Our electrical engineering for healthcare facilities encompasses normal power distribution, essential electrical system design per NFPA 99, emergency generator systems, automatic transfer switches, and uninterruptible power supplies for critical clinical equipment. We design electrical infrastructure that meets code-required redundancy while eliminating unnecessary complexity, ensuring reliable power delivery to every branch of the essential electrical system.
Healthcare Commissioning
Our commissioning services verify that every MEP system in your healthcare facility performs according to design intent before patients enter the building. From pre-functional checklists through functional performance testing, 5BY5 delivers rigorous, documented verification that supports Joint Commission accreditation, CMS compliance, and state licensing requirements.
Medical Gas & Plumbing Systems
5BY5 designs medical gas systems, oxygen, medical air, vacuum, nitrogen, and waste anesthetic gas disposal, in full compliance with NFPA 99 and ASSE 6000 series standards. Our plumbing designs address domestic water with infection control measures, specialized healthcare waste systems, and laboratory utility systems. Every design prioritizes safety, reliability, and accessibility for maintenance.
Infrastructure Improvements for Existing Healthcare Facilities
For hospitals and medical centers with aging infrastructure, 5BY5 designs phased improvement projects that upgrade MEP systems without disrupting clinical operations. We assess existing conditions, identify performance gaps, and develop modernization plans that extend facility life, improve energy efficiency, and bring legacy systems into current code compliance.
OUR process
STEP ONE
Heading: Learn Your Facility and Clinical Mission
Every 5BY5 healthcare engagement begins with a thorough discovery phase. We meet with facility directors, clinical leadership, maintenance staff, and project stakeholders to understand the facility's operational requirements, clinical workflows, existing infrastructure conditions, and project goals. We review applicable codes and standards, NFPA 99, ASHRAE 170, FGI Guidelines, and local jurisdiction requirements, in the context of your specific facility type. This phase typically spans two to four weeks, depending on project complexity, and results in a clear project brief that aligns every team member on scope, expectations, and success criteria.
STEP TWO
Collaborate With Your Entire Project Team
Healthcare projects succeed when engineers, architects, contractors, and facility teams work as a unified group. During this phase, 5BY5 participates in design coordination meetings, conducts value engineering workshops, and engages directly with infection control practitioners, biomedical engineering, and facilities management. We present system concepts, solicit feedback, and refine designs collaboratively, often identifying opportunities to reduce costs and simplify operations that would be invisible in a siloed design process. This collaborative phase runs concurrently with schematic and design development, typically four to eight weeks.
STEP THREE
Design Systems for Efficiency, Reliability, and Simplicity
With a validated design concept in hand, our engineers produce complete construction documents, plans, specifications, schedules, and details, that translate complex healthcare requirements into clear, buildable instructions. Every design decision is evaluated against three criteria: system efficiency, reliability, and simplicity of operation. Equipment selections prioritize standardization and maintainability. Control sequences are written in plain language. Construction documents undergo internal quality review before delivery. This phase spans six to twelve weeks depending on project scale, with regular owner checkpoints throughout.
STEP FOUR
Commission Every System to Verified Performance
Before your facility opens its doors, 5BY5 verifies that every MEP system operates exactly as designed. Our commissioning engineers conduct pre-functional inspections during construction, execute functional performance tests on all major systems, and document results in a comprehensive commissioning report. Deficiencies are tracked to resolution. The final deliverable is a verified, documented record of system performance that supports accreditation surveys and gives your operations team confidence from day one. Commissioning timelines align with construction schedules, typically spanning the final three to six months of the project.
STEP FIVE
Deliver Documentation Your Team Can Use
A healthcare MEP project is not complete when construction ends, it is complete when your facility team has everything they need to operate and maintain the building independently. 5BY5 delivers comprehensive operations and maintenance documentation, graphic sequences of operation, as-built drawings, and training sessions tailored to your staff's experience level. We remain available for post-occupancy support, system optimization, and future planning. This final phase ensures a seamless transition from construction to operations, typically completed within four to six weeks after substantial completion.
Our APPROACH
At 5BY5 Engineering, our core philosophy is that complexity is the enemy of operational excellence in healthcare facilities.
Every hospital and medical center has a finite amount of staff attention, maintenance budget, and operational bandwidth. Our job as MEP engineers is to maximize system performance while minimizing the operational burden on the people who keep the building running. This is not a marketing tagline; it is a design methodology that governs every decision we make, from equipment selection to control system architecture.
Our methodology is rooted in three principles that founder Brock Centlivre established when he launched 5BY5 in 2016: learn, collaborate, and perform. We learn by immersing ourselves in each client's operational reality before we design anything. We collaborate by treating every stakeholder, from the hospital CEO to the night-shift maintenance technician, as a source of critical design intelligence. And we measure our performance not by the sophistication of our drawings, but by three tangible outcomes: system efficiency, reliability, and simplicity of operation. If a system cannot be understood and maintained by the facility's own team, we have not done our job.
This approach has particular resonance in the Kansas City healthcare market, where regional health systems like Children's Mercy, Saint Luke's, and LMH Health operate multiple facilities with diverse infrastructure ages and conditions. These organizations need an engineering partner who understands that a 1990s-vintage central plant has different operational constraints than a brand-new patient tower, and who can design MEP solutions that integrate seamlessly across both. Our local presence in downtown Kansas City, combined with nearly a decade of relationships with regional health systems, gives us institutional knowledge that accelerates every project.
The result is healthcare MEP engineering that performs at the highest technical level while remaining accessible to the people who depend on it most. Our clients do not just receive construction documents; they receive systems they can trust, operate, and maintain for the life of the building.
FREQUENTLY ASKED QUESTIONS
5BY5 Engineering was founded by Brock Centlivre in 2016 and is headquartered at 1100 Main Street in downtown Kansas City, Missouri. The firm specializes in healthcare MEP engineering, serving over 100 building owners across the Kansas City metropolitan area with mechanical, electrical, and plumbing design, commissioning, and infrastructure improvement services.
-
Healthcare facilities must comply with specialized codes including NFPA 99, ASHRAE Standard 170, and FGI Guidelines that do not apply to commercial buildings. These codes govern everything from operating room ventilation rates and pressure relationships to emergency power system architecture and medical gas distribution. 5BY5 Engineering specializes in navigating these requirements, ensuring your facility meets accreditation and licensing standards while maintaining cost-effective, simplified operations.
-
Our savings come from early-phase value engineering, questioning design assumptions, right-sizing equipment, consolidating redundant systems, and eliminating components specified out of convention rather than code requirement. By integrating cost discipline into the design process from the first day rather than performing value engineering after bids come in, we remove waste before it reaches the construction budget. These savings have been documented across projects with major Kansas City health systems.
-
Yes. We offer comprehensive commissioning services that verify every MEP system performs according to design specifications before your facility opens. Our commissioning process includes pre-functional inspections, functional performance testing, deficiency tracking, and a complete commissioning report. This documentation directly supports Joint Commission accreditation surveys, CMS compliance reviews, and Missouri and Kansas state licensing inspections.
-
5BY5 Engineering has provided MEP engineering services for several of the Kansas City region's leading healthcare organizations, including Children's Mercy, Saint Luke's Health System, and LMH Health. Our projects have ranged from facility expansions and infrastructure upgrades to critical backup system design and commissioning services. These long-term relationships reflect our deep understanding of regional healthcare infrastructure needs.
-
Absolutely. Infrastructure improvement projects in occupied healthcare facilities require careful phasing, infection control risk assessments, and coordination with clinical operations. 5BY5 designs renovation and upgrade projects with detailed phasing plans that maintain critical system operation throughout construction. Our experience with Kansas City-area hospitals ensures we understand the operational constraints and communication protocols required to keep clinical areas functioning safely during construction.
Simplify Your Healthcare Systems
Ready to reduce costs and complexity? Let's talk about your next healthcare facility project.