Redundant Power and Precision Cooling Designed to Keep Your Mission-Critical Systems Online

Every minute of data center downtime costs thousands of dollars, and for healthcare systems, financial institutions, and enterprise operations across Kansas City, a single environmental failure can cascade into catastrophic data loss, regulatory exposure, and operational paralysis.

The stakes are absolute: your servers demand uninterrupted power, precisely controlled temperatures, and environmental conditions that never waver. Yet too many data centers in the region rely on MEP systems that were designed as afterthoughts, bolted onto generic building plans rather than engineered from the ground up for mission-critical loads.

5BY5 Engineering brings a fundamentally different approach to data center MEP design. Our team's deep experience engineering critical systems for healthcare facilities, environments where system failure literally threatens lives, translates directly to the uncompromising reliability your data center requires. We design fully redundant electrical distribution, precision cooling architectures, and integrated monitoring systems that anticipate failure before it happens. Every circuit, every air handler, every sensor is purpose-engineered for continuous uptime and operational simplicity.

For Kansas City's growing technology and healthcare sectors, this means partnering with a local engineering team that understands both the regional climate challenges, from extreme summer heat loads to volatile storm seasons, and the specific regulatory and operational demands of housing critical IT infrastructure. When your data center MEP systems are designed by 5BY5, you gain more than engineering drawings. You gain peace of mind that your most valuable digital assets are protected by systems built to never fail.

Saved clients over $1 million in unnecessary construction costs

Helped clients simplify operations, saving over $300,000 yearly in maintenance fees

Helped over 100 owners make buildings more efficient with well-designed MEP systems

Proven experience with Kansas City brewery projects, including City Barrel Brewery and Limitless Brewing

Founded in 2016 by Brock Centlivre, PE, Principal in Charge

Our Services

Data center MEP engineering is the specialized discipline of designing mechanical, electrical, and plumbing systems purpose-built for environments that house servers, networking equipment, storage arrays, and the supporting infrastructure that keeps digital operations running.

Unlike conventional commercial buildings, data centers demand extraordinary precision in power delivery, thermal management, humidity control, and fire protection, all operating simultaneously with zero tolerance for interruption.

At 5BY5 Engineering, the process begins with a comprehensive facility assessment and load analysis. Our engineers work directly with your IT and facilities teams to document current and projected power densities, rack configurations, and cooling requirements. We evaluate the existing electrical infrastructure for capacity and redundancy gaps, assess HVAC systems against industry benchmarks such as ASHRAE thermal guidelines, and identify single points of failure that put your operations at risk. This discovery phase ensures that every design decision is rooted in your facility's actual operating conditions and growth trajectory.

From there, we develop fully integrated MEP designs that coordinate electrical distribution with N+1 or 2N redundancy configurations, precision air conditioning systems utilizing hot aisle/cold aisle containment strategies, uninterruptible power supply integration, emergency generator coordination, and building management system interfaces that provide real-time environmental monitoring and alarm escalation. Every discipline, mechanical, electrical, and plumbing, is designed in concert to eliminate conflicts, reduce construction costs, and deliver a facility that operates exactly as intended from day one.

The outcome is a data center environment that meets or exceeds Tier II through Tier IV reliability standards, operates with maximum energy efficiency to control ongoing utility costs, and provides the operational simplicity that allows your facilities team to manage complex systems with confidence. For Kansas City organizations scaling their IT footprint, 5BY5 delivers MEP designs that protect your investment today and accommodate growth tomorrow.

Protect Your Critical Operations with Engineered Reliability

how you benefit

OUR SERVICE Categories

Data Center Electrical Design

5BY5 designs complete electrical distribution systems for data centers, including redundant utility feeds, automatic transfer switches, UPS integration, emergency generator coordination, and power distribution units. Every electrical design is engineered for the specific redundancy tier your operation requires, from N+1 configurations for cost-effective reliability to fully redundant 2N architectures for zero-downtime operations. We coordinate with local Kansas City utilities to optimize service entrance configurations.

Server Room Precision Cooling

Our mechanical engineers design cooling systems calibrated to your facility's exact heat loads and rack densities. Services include hot aisle/cold aisle containment design, computer room air conditioning (CRAC) and air handler (CRAH) specification, in-row and rear-door cooling solutions for high-density applications, economizer integration for Kansas City's climate, and humidity control systems that protect sensitive electronics from both condensation and electrostatic discharge.

Critical Power and Backup Systems

From UPS sizing and battery room design to emergency generator specification and fuel system coordination, 5BY5 engineers back up power systems that seamlessly bridge utility interruptions. Our designs ensure automatic transfer occurs within milliseconds, generators reach full load capacity on schedule, and your IT equipment never experiences a power disruption, regardless of external conditions.

Data Center Monitoring and Controls

5BY5 designs integrated building management and environmental monitoring systems that provide real-time visibility into temperature, humidity, power consumption, and equipment status across your entire facility. Alarm configuration, escalation protocols, historical trending, and remote access capabilities give your operations team complete control, whether they're on-site or managing remotely.

Data Center Infrastructure and Expansion Planning

5BY5 provides comprehensive infrastructure planning that addresses cable management pathways, raised floor systems, structural loading coordination, fire suppression integration, and phased expansion strategies. We design infrastructure that supports your current deployment while reserving capacity and physical space for future growth, protecting your capital investment over the full lifecycle of your facility.

OUR process

STEP ONE

Discovery and Critical Load Assessment

Every 5BY5 data center engagement begins with a thorough discovery phase. Our engineers meet with your IT, facilities, and operations teams to understand current server loads, power densities, growth projections, and operational requirements. We conduct a comprehensive assessment of existing infrastructure, electrical capacity, cooling performance, environmental conditions, and single points of failure. This phase typically spans 2-3 weeks depending on facility complexity and produces a detailed findings report that serves as the foundation for all design decisions. Your team's input is essential during this phase, as operational knowledge and growth plans directly shape the engineering solution.

STEP TWO

Conceptual Design and Redundancy Planning

Based on discovery findings, 5BY5 develops conceptual MEP design options that present your team with clear choices regarding redundancy levels, cooling strategies, and infrastructure configurations. Each option includes preliminary cost estimates, energy projections, and scalability assessments so you can make informed decisions aligned with your budget and operational priorities. This collaborative phase typically takes 2-4 weeks and involves one or two design review sessions with your stakeholders. We present trade-offs transparently, helping you invest in reliability where it matters most without over-engineering areas where the risk doesn't justify the cost.

STEP THREE

Detailed Engineering Design and Coordination

Once a conceptual direction is approved, our team produces complete construction documents, detailed mechanical, electrical, and plumbing drawings with specifications, equipment schedules, and control sequences. This phase typically spans 4-8 weeks and includes full interdisciplinary coordination to eliminate conflicts between mechanical ductwork, electrical distribution, plumbing, fire suppression, and IT cable pathways. Your facilities team reviews documents at 50% and 90% completion milestones to confirm that every design element aligns with operational expectations before documents are issued for construction.

STEP FOUR

Construction Support and Quality Assurance

During construction, 5BY5 provides engineering support including submittal review, RFI responses, site observations, and coordination with contractors to ensure the design intent is faithfully executed. We review contractor submittals for equipment compliance, observe critical installations such as electrical switchgear terminations and cooling system piping, and address field conditions that require design adaptation. This phase runs concurrent with the construction schedule and ensures that what gets built matches what was designed, eliminating costly rework and protecting system performance.

STEP FIVE

Commissioning, Testing, and Operational Handoff

Before your data center goes live, 5BY5 coordinates comprehensive testing and commissioning of all MEP systems. This includes electrical load bank testing, cooling system performance verification under simulated load conditions, UPS and generator transfer testing, monitoring system calibration, and fire suppression system acceptance testing. We provide your operations team with detailed documentation including as-built drawings, equipment manuals, maintenance schedules, and emergency operating procedures. This phase typically takes 2-4 weeks and concludes with a formal handoff that ensures your team is fully prepared to operate the facility with confidence.

Our APPROACH

At 5BY5 Engineering, our core philosophy is rooted in a simple conviction: the best-engineered systems are the ones that your team can operate, maintain, and trust without hesitation.

In the data center world, where complexity can become the enemy of reliability, this philosophy drives every design decision we make. We don't pursue engineering complexity for its own sake. We pursue the simplest system architecture that delivers the required level of reliability, redundancy, and performance, because simple systems fail less often, cost less to maintain, and empower your facilities team to respond with confidence when conditions change.

Our methodology translates directly from our extensive healthcare facility experience, where MEP system failure carries consequences measured not in dollars but in patient safety. In those environments, we learned that redundancy must be deliberate rather than reflexive, that every system must have a clear failure mode and recovery path, and that operational simplicity is not a compromise, it's a design requirement. We apply these same principles to every data center project: identify the actual risk profile, design redundancy that matches that profile, and deliver systems that your team understands thoroughly from the day they take ownership.

For the Kansas City market specifically, our approach accounts for regional factors that national design firms often overlook. We understand the local utility infrastructure, the seasonal climate extremes that stress cooling systems from July through September, the storm patterns that make generator reliability and electrical protection essential, and the specific code requirements enforced by Kansas City and Missouri authorities having jurisdiction. This local knowledge means fewer surprises during construction, faster permitting, and designs that perform optimally in the actual conditions your facility will face, not theoretical conditions from a generic design template.

The result is data center MEP engineering that balances technical rigor with practical operability. Our clients don't just receive a set of construction documents; they receive a facility that works the way it was intended, operated by a team that understands exactly how and why every system was designed the way it was. That is the 5BY5 approach: learn your operation, collaborate with your team, and perform to the standard that mission-critical systems demand.

FREQUENTLY ASKED QUESTIONS

5BY5 Engineering was founded in 2016 by Brock Centlivre and is headquartered in downtown Kansas City, Missouri. The firm specializes in mechanical, electrical, and plumbing engineering for mission-critical facilities, with deep expertise in healthcare, government, and commercial sectors. With over 100 successfully delivered projects and more than $1 million in documented construction cost savings for clients, 5BY5 has established a reputation for engineering reliability, operational simplicity, and cost-effective MEP solutions across the Kansas City metropolitan area.

Reliable Data Center MEP in KC

Protect your mission-critical operations with MEP systems engineered for zero downtime.