Commercial Kitchen MEP Design in Kansas City

Ventilation, Cooling & Safety Systems Engineered for Kitchens That Never Stop Working

Commercial kitchens are among the most demanding environments any building can house.

Between the intense heat generated by cooking equipment, the grease-laden exhaust that must be safely captured and removed, the massive electrical loads powering everything from walk-in coolers to convection ovens, and the plumbing demands of prep stations and warewashing systems, the MEP requirements of a food service operation dwarf those of a typical commercial space. When these systems aren't designed with precision and real-world operational understanding, the consequences are immediate, uncomfortable working conditions, health code violations, skyrocketing energy costs, and equipment that fails when it matters most.

5BY5 Engineering brings a practical, operations-first approach to commercial kitchen MEP design that transforms these challenges into reliable, efficient systems. Rather than over-engineering solutions that inflate construction budgets or under-designing systems that create maintenance nightmares, our team works collaboratively with restaurant owners, food service operators, and hospitality facility managers to understand exactly how the kitchen will function, the menu complexity, the peak service volumes, the staffing model, and the growth ambitions. This deep understanding of day-to-day operations allows us to design ventilation, cooling, electrical, and plumbing systems that genuinely support culinary excellence while protecting worker safety and food quality.

For Kansas City's thriving restaurant and hospitality scene, this means partnering with engineers who understand the local codes, climate considerations, and the unique demands of operating a high-performance kitchen in the Midwest. From downtown Kansas City's bustling food corridors to expanding hospitality venues across the metro, 5BY5 delivers MEP designs that are buildable, maintainable, and aligned with your budget, saving you money both during construction and every day your kitchen operates.

Saved clients over $1 million in unnecessary construction costs

Helped clients simplify operations, saving over $300,000 yearly in maintenance fees

Helped over 100 owners make buildings more efficient with well-designed MEP systems

Proven experience with Kansas City brewery projects, including City Barrel Brewery and Limitless Brewing

Founded in 2016 by Brock Centlivre, PE, Principal in Charge

Our Services

Commercial kitchen MEP design encompasses the engineering of all mechanical, electrical, and plumbing systems required to operate a safe, compliant, and efficient food production environment.

This includes HVAC and ventilation systems tailored to the extreme heat and moisture loads of cooking operations, grease exhaust and makeup air systems that meet fire and health codes, electrical distribution sized for high-demand commercial equipment, plumbing for food prep and sanitation, and refrigeration infrastructure for proper food storage. At 5BY5 Engineering, this service is delivered as a fully coordinated design package that integrates every system into a cohesive, operational whole.

Our process begins with a thorough learning phase where we engage with the project stakeholders, the restaurant owner, the chef or kitchen manager, the architect, the general contractor, and the local authority having jurisdiction. We study the proposed menu and equipment list, analyze the kitchen layout for workflow and heat load distribution, and identify code requirements specific to your location and building type. This upfront investment in understanding the operation ensures that every engineering decision we make downstream serves the people who will actually work in and maintain these systems.

From there, we develop detailed MEP design documents that coordinate ventilation hood placement and exhaust rates with makeup air delivery, balance kitchen HVAC zones against adjacent dining areas to prevent heat migration and odor transfer, size electrical panels and circuits for the specific equipment being installed, and route plumbing for both operational efficiency and sanitary compliance. Every design decision is evaluated against three criteria that define our performance standard: system efficiency, reliability, and simplicity of operation.

The result is a commercial kitchen where the engineering disappears into the background, where cooks can focus on food rather than fighting uncomfortable temperatures, where managers aren't fielding maintenance calls every week, and where the utility bills reflect smart design rather than brute-force solutions. For Kansas City restaurant owners and hospitality operators, this means an MEP partner who delivers construction-ready documents that contractors can build confidently, and facilities teams can operate without specialized training.

Engineer Your Kitchen for Culinary Excellence

how you benefit

OUR SERVICE Categories

Commercial Kitchen Ventilation & Exhaust Design

5BY5 designs complete kitchen ventilation systems, including Type I and Type II exhaust hoods, grease exhaust ductwork, makeup air systems, and demand-controlled kitchen ventilation. Every design is coordinated with fire suppression, balances airflow to prevent negative pressure issues, and includes access points for simplified maintenance by your facilities team.

Kitchen HVAC & Cooling Systems

We engineer HVAC solutions specific to the extreme thermal loads of commercial kitchens, including spot cooling for cook lines, tempered makeup air delivery, and energy recovery systems. Our designs maintain worker comfort year-round while preventing kitchen heat from degrading the dining room guest experience.

Electrical Distribution for Commercial Kitchen Equipment

We design electrical systems sized for the high-demand loads of commercial cooking, refrigeration, and warewashing equipment. Our approach includes load management strategies, efficient lighting design, and panel layouts that allow for future equipment additions without costly retrofits.

Commercial Kitchen Plumbing & Sanitary Systems

From grease interceptor sizing and floor drain placement to hot water system design and backflow prevention, 5BY5 delivers plumbing systems that support food safety compliance and efficient kitchen workflow. Every design prioritizes cleanability and long-term maintainability.

Kitchen-to-Dining Area Environmental Coordination

5BY5 specializes in coordinating the MEP systems between kitchen and front-of-house spaces, engineering pressure relationships, sound attenuation, and odor control to ensure the guest experience is never compromised by kitchen operations.

OUR process

STEP ONE

Learn Your Kitchen Operation and Project Goals

(Weeks 1-2)

Every 5BY5 commercial kitchen project begins with our Learn phase, a deliberate investment in understanding your operation before we draw a single line. We meet with you, your chef or kitchen manager, your architect, and your contractor to understand the menu concept, anticipated service volumes, peak demand periods, staffing model, and growth plans. We review the proposed equipment list and kitchen layout, identify local code requirements, and assess the existing building conditions if it's a renovation. This phase also includes understanding your maintenance capabilities, who will operate these systems day-to-day, and what level of complexity is appropriate. The goal is to ensure that every engineering decision we make is grounded in the reality of how your kitchen will actually function.

STEP TWO

Collaborate With the Full Project Team on Integrated Design

(Weeks 2-4)

With a thorough understanding of the operation, we enter our Collaborate phase, working closely with every stakeholder to develop an integrated MEP design. We coordinate with the architect on space allocation for mechanical equipment, with the kitchen designer on hood placement and equipment rough-ins, with the fire suppression contractor on system integration, and with the general contractor on constructability. Multiple coordination meetings ensure that conflicts are identified and resolved on paper, not in the field where they become expensive change orders. You'll see preliminary designs and have the opportunity to provide feedback before we move to final documentation, ensuring alignment between the engineered systems and your operational vision.

STEP THREE

Deliver Construction-Ready MEP Design Documents

(Weeks 4-6)

We produce detailed, fully coordinated MEP construction documents including mechanical plans, electrical plans, plumbing plans, equipment schedules, and specifications. These documents are developed to be clear and buildable, minimizing the need for contractor interpretation and reducing the risk of field errors. We submit for permit review and support the approval process, addressing any code review comments promptly. The deliverable is a complete package that your contractor can price accurately, bid competitively, and build with confidence.

STEP FOUR

Support Construction and Commissioning

(Duration varies by project)

5BY5 remains engaged through construction to answer contractor questions, review submittals, and address field conditions that inevitably arise. We conduct site visits at key milestones to verify that systems are being installed in accordance with our design intent. If commissioning services are included, we develop and execute functional performance testing to verify that every system operates as designed: exhaust rates, makeup air balance, temperature control, equipment interlocks, before you serve your first plate. Our goal is to hand you a kitchen where every system works, your staff knows how to operate it, and you have confidence in its long-term reliability.

Our APPROACH

At 5BY5 Engineering, our approach to commercial kitchen MEP design is rooted in a simple conviction: building systems should serve the people who use them every day.

This philosophy, embodied in our core values of Learn, Collaborate, and Perform, shapes every decision we make, from the initial project meeting to the final commissioning walkthrough. We don't believe in engineering for engineering's sake. We believe in systems that work for the line cook pulling a 12-hour shift, for the restaurant manager trying to keep utility costs under control, and for the facility maintenance technician who needs to service equipment without a mechanical engineering degree.

Our methodology is built around understanding operations before designing systems. Commercial kitchens are uniquely unforgiving environments; they generate extreme heat, produce grease-laden exhaust, demand enormous amounts of electrical power, and require plumbing systems that must perform under constant, heavy use. Generic MEP design approaches that work perfectly well for office buildings or retail spaces fall short in food service environments. That's why we invest significant time upfront studying the specific operation we're designing for, learning from the people who will work in and maintain the space, and collaborating with every member of the project team to develop solutions that reflect the real-world demands of the kitchen.

We measure our performance against three criteria on every project: system efficiency, reliability, and simplicity of operation. For a commercial kitchen, this means ventilation systems that capture grease effectively without consuming excessive energy, HVAC systems that maintain worker comfort reliably through Kansas City's seasonal extremes, plumbing designed for easy maintenance and food safety compliance, and electrical systems that can handle the demands of a full-service rush without tripping breakers. Every system is designed to be operable by your staff, not just by the engineers who designed it.

This practical, operations-aware approach is what distinguishes 5BY5 in the Kansas City market. Our experience with hospitality facilities and food production environments, combined with our track record of helping over 100 building owners achieve more efficient operations, gives us the perspective to design commercial kitchens that don't just meet code, but genuinely support culinary excellence and business success.

FREQUENTLY ASKED QUESTIONS

5BY5 Engineering was founded in 2016 by Brock Centlivre and is headquartered in downtown Kansas City, Missouri. The firm specializes in mechanical, electrical, and plumbing engineering with particular expertise in hospitality, healthcare, and government facilities. Having helped over 100 building owners achieve more efficient operations and saved clients more than $1 million in construction costs, 5BY5 brings proven, practical MEP engineering to Kansas City's food service and hospitality industry.

Build a Better Kitchen With 5BY5

Create the perfect kitchen environment for culinary excellence — engineered for safety, comfort, and efficiency.